Stakeholder Participation and Performance of Funded Project in Rwanda: A Case of Aveh Umurerwa Project in Bugesera District

Authors

  • Alexis Ndayizeye Mount Kenya University, Kigali, Rwanda
  • Paul Munene Mount Kenya University, Kigali, Rwanda

DOI:

https://doi.org/10.53819/81018102t2061

Abstract

The main purpose of this study was to examine the role of stakeholder participation in project performance of funded project in Rwanda. The specific objectives of the study were based on assessing the role of consultative planning, collective implementation and joint monitoring and project performance of AVEH Umurerwa project in Bugesera District of Rwanda. The study target population was 251 people in which 188 respondents were drawn as a sample size of the study in AVEH Umurerwa project in Bugesera District of Rwanda. The researcher used descriptive research design with a mixed approach of qualitiative and quantitative data. Thus, the study used the questionnaires and interview guides to collect data from the field. The stratified random sampling technique was used to ensure that all the stakeholders of the funded project are selected with the equal chance to participate in the study as from each group of the respondents. The results of the first objective revealed that consultative planning plays a significant and a positive role on performance of funded project in Rwanda since the descriptive results shown 1.621 overall mean and the Pearson correlation results confirmed that there is a positive and significant relationship between consultative planning and quality performance(r=0.712 and sig=0.00<0.01), budgetary performance (r=0.717 and sig=0.00<0.01), and schedule performance (r= 0.783 and sig=0.00<0.01) which implies that there is positive and significant relationship between consultative planning and performance of funded projects in Rwanda. The results of the second objective revealed that collective implementation plays a significant and a positive effect on performance of funded project in Rwanda since the descriptive results shown 1.324 of overall mean; when Pearson correlation results proved a positive and significant relationship between collective implementation and budgetary performance (r=0.647 and sig=0.00<0.01), schedule performance (r=0.639 and sig=0.00<0.01), and quality performance (r= 0.696 and sig=0.00<0.01) which implies that collective implementation has a positive and significant relationship with performance of funded projects in Rwanda. Lastly, the results of the third objective revealed that a big number of respondents strongly agreed that joint monitoring plays a significant role in performance which is also supported by the correlation results which revealed that joint monitoring and budgetary performance has (r=0.650 and sig=0.00<0.01), schedule performance has (r=0.644 and sig=0.00<0.01), and quality performance has (r= 0.705 and sig=0.00<0.01) which implies that there is positive and significant relationship between joint monitoring and performance of funded projects in Rwanda. Thus, basing on the results the researcher concluded that stakeholder participation plays a significant and positive role in performance of funded project in Rwanda.

Keywords: Stakeholder Participation, Performance of Funded Projects, Rwanda

Author Biographies

Alexis Ndayizeye, Mount Kenya University, Kigali, Rwanda

School of Business and Economics, Master of Business Administration (MBA), Project Management, Mount Kenya University, Kigali, Rwanda

Paul Munene, Mount Kenya University, Kigali, Rwanda

Mount Kenya University, Kigali, Rwanda

References

Aaltonen, K. (2011). Project stakeholder analysis as an environmental interpretation process. International Journal of Project Management, 29(2), 165-183. https://doi.org/10.1016/j.ijproman.2010.02.001

Chang, A., Chih, Y.-Y., Chew, E., & Pisarski, A. (2013). Reconceptualising mega project success in Australian Defence: Recognizing the importance of value co-creation. International Journal of Project Management, 31(8), 1139-1153. https://doi.org/10.1016/j.ijproman.2012.12.005

Clarkson, M. B. E. (2015). Stakeholder framework for analyzing and evaluating corporate social performance. Academy of Management Review, 20 (1), 14-23. https://doi.org/10.2307/258888

Gonzalez H. U. (2018). Stakeholder engagement to evaluate tourist development plans with a sustainable approach. Mexico City, Mexico. https://doi.org/10.1002/sd.1849

Gonzalez, J., Pronello, C., & Grau, J. M. S. (2018). Multi-stakeholder collaboration in urban transport: State-of-the-art and research opportunities. Journal of Transport, 33(4), 1079-1094. DOI: https://doi.org/10.3846/transport.2018.6810

Harelimana, J.B. (2017). Towards Affordable Low Cost Housing: Strategies of Low Cost Housing Development for the Low Income Population in Rwanda. International Journal of Family Business Management 1(1): 1-7. https://doi.org/10.15226/2577-7815/1/1/00109

Hofisi, C., & Chizimba, M. (2013). The sustainability of donor funded projects in Malawi. Mediterranean Journal of Social Sciences, 4(6), 705-705. https://doi.org/10.5901/mjss.2013.v4n6p705

Isham, J., & Kähkönen, S. (2012). Institutional determinants of the impact of community-based water services: Evidence from Sri Lanka and India. Economic development and cultural change, 50(3), 667-691. https://doi.org/10.1086/342357

Khwaja, A. I. (2014). Is increasing community participation always a good thing?. Journal of the European economic Association, 2(2-3), 427-436. https://doi.org/10.1162/154247604323068113

Lim, S.K. & Yang, Y. (2022). Understanding the Need of Project Stakeholders for Improving Sustainability Outcomes in Infrastructure Projects. Unpublished PhD thesis at Queensland University of Technology, Australia.

Mnaranara, T. (2010). The importance of community participation in an ongoing Constructions of Primary Schools. A case study of Mlali and Mzumbe ward, unpublished master’s thesis at University of Agder. Kristiansand, Norway

Muniu, F. N., Gakuu, C., & Rambo, C. M. (2018). Community Participation in Resource Mobilization and Sustainability of Community Water Projects in Kenya. IOSR Journal of Humanities and Social Science (IOSR-JHSS), 23(2), 70-80.

Temba, F. I. (2015). Assessing the role of stakeholder’s participation on sustainability of donor funded project: A case study of youth with disabilities community program in Tanga Doctoral dissertation, The Open University of Tanzania.

Tiffow, R. (2013), Monitoring and evaluating stakeholders’ participation in agriculture and rural development project. Rome, FAO.

Downloads

Published

2022-05-05

How to Cite

Ndayizeye, A., & Munene, P. (2022). Stakeholder Participation and Performance of Funded Project in Rwanda: A Case of Aveh Umurerwa Project in Bugesera District. Journal of Entrepreneurship & Project Management, 6(2), 8–32. https://doi.org/10.53819/81018102t2061

Issue

Section

Articles