Nobody sets out to fail, yet projects are still failing to reach to their intended objectives. This cross-sectional research design investigated effect of project planning practices and project performance, evidence from Umurimo Kuri Bose in Rwamagana District, Rwanda. Specifically, this study sought to analyse the effect of project scope planning, and project risk planning on project performance, a case of Umurimo Kuri Bose Project. The population of this research was beneficiaries of Umurimo Kuri Bose, a project implemented by education development center in Rwamagana district and local leaders in Rwamagana district. Total population were 906 and sample size was 279 calculated using Yamane formula. Both simple random and purposive sampling techniques were employed. Regarding to first objective of this study, the findings showed that 50.5% concurred that, identifying project activities significantly contribute to the performance of Umurimo Kuri Bose Project, and about 46.5% strongly agreed that estimation significantly contributes to the performance of the project while 37.7% asserted that identifying risk and their risk response is the main contributor of project performance. During the interview, staff members of EDC emphasised that identifying overall project activities and align them with time and budget should be the root foundation of ensuring better project performance. Moreover, the findings showed that most of the respondents agreed that cost efficiency, quality of a completed project and completing a project on time are the main indicators of a project performance indicated by 78.8%, 68.4% and 65.2% respectively. Based on the interpretation of collected and analyzed data during this study which aimed to assess the contribution of project planning practices and project performance. The study concluded effective scope planning, cost planning and risk significantly contribute to the performance of project in Rwanda whereby scope planning has 0.696, cost planning has 0.749 and risk planning has 0.845 with project performance. The study recommended similar organizations to EDC to adopt the habit of cost, scope and risk planning in their planning practices as a way of securing project performance; for effective and efficiency use of resources, during cost planning, organizations are advised to outsource experienced personnel in budgeting and finance; lastly there is always a need to set a clear and realistic project scope during project planning which is the basis for setting clear project indicators, outputs and outcomes.

Keywords: Project Planning, Project scope planning, Project risk planning, Performance

Author Biographies

Odette Abanyagasani , Mount Kenya University

Postgraduate Student

Dr. Njenga Gitahi Samson, Ph.D, Mount Kenya University

Lecturer

References

Alashwal, A. M., & Sabahi, M. H. (2018). Risk factors in construction projects during unrest period in Yemen. Journal of Construction in Developing Countries, 23(2), 43-62. doi:10.21315/jcdc2018.23.2.4.

Awuzie, B. O., & Haupt, T. C. (2018). Risk management practices in the South African construction industry. Journal of Engineering, Design, and Technology, 16(6), 867-885.

Cakmak, P. I., & Tezel, E. (2019). A guide for risk management in construction projects: Present knowledge and future directions. In N. Khatleli (Ed.), Risk Management in Construction Projects (pp. 600-613).

Chapman, R. J. (2019). Exploring the value of risk management for projects: Improving capability through the deployment of a maturity model. IEEE Engineering Management Review, 47(3), 126-143.

Chmielarz, W.; Zborowski, M. A (2019) Hybrid Method of Assessing Individual Electronic Banking Services. The Case of Poland. Procedia Comput. Sci., 176, 3881–3889

Di Fan, Dermot B, Jamie L. Callahan, M, I-W.(2022). Advancing literature review methodology through rigor, generativity, scope and transparency. International Journal of Financial Review. 4 (2)23-25.

Eulerich, M., & Kalinichenko, A. (2018). The current state and future directions of continuous auditing research: An analysis of the existing literature. Journal of Information Systems, 32(3), 31-51. doi:10.2308/isys-51813.

Grigore, M. C., Ionescu, S., & Niculescu, A. (2018). New methods for project monitoring. FAIMA Business and Management Journal, 6(1), 35-44.
Gupta GN & Gupta, N. (2022). Research Methodology. SBPD Publications.

Habimana, O., Nkubito, D., & Jyambere, L. (2018). PROFIFA:Baseline survey final report . Kigali: Care International Rwanda .

Hofstede Insights. (n.d.). National culture. Retrieved from https://www.hofstede-insights.com/

Karlson (2021)..Empirical research on project management in Kenya, Conference of Management education for 21st Century September 2022.

Laerd Statistics (2018). Spearman’s correlation using SPSS statistics. Statistical tutorials and software guides. Retrieved from https://statistics.laerd.com/

Larson, E. W., & Gray, C. F. (2020). Project management: The managerial process. McGraw-Hill Education.

Lauren, T. (2020). Stratified Sampling | A Step-by-Step Guide with Examples

Liu, J., Low, S. P., & Zhang, Q. (2018). Enterprise risk management practices of top ENR international contractors. International Journal of Construction Management, 18(5), 364-374. doi:10.1080/15623599.2017.1326299.

Muhammad Huzaifa Butt, Shahid Iqbal, Muhammad Abubakar Saddique, & Hamza Shahid. (2021). The Effect of Risk Management at Project Planning Phase on Performance of Construction Projects in Pakistan.

Mukeshimana Eric, Dr. Dushimimana Jean de dieu, Mutabazi Placide, & Ndabananiye Gamariel. (2022). Effect of Project Planning Practices on Improving Project Performance in Rwanda. A Case of Huguka Dukore Akazi Kanoze Project in Nyabihu District (2017-2020). International Journal of Social Sciences: current and Future Research Trends, 13(1), 88–94. Retrieved from https://ijsscfrtjournal.isrra.org/index.php/Social_Science_Journal/article/view/98

Musanje, J., & Akintoye, A. (2015). Critical success factors for effective risk management procedures in the construction industry: Evidence from Nigeria. International Journal of Project Management, 33(5), 1014-1024.

Nikuze, A., Sliuzas, R., Flacke, J., & van Maarseveen, M. (2019). Livelihood impacts of displacement and resettlement on informal households - Kigali, Rwanda. Habitat International, 86(February), 38–47. https://doi.org/10.1016/j.habitatint.2019.02.006

Obondi K. C. (2020b). The impact of project risk audits on construction project success. Journal of Engineering Management and Competitiveness (JEMC), 10(2), 103- 115.

Obondi, K. C. (2020a). The Relationship Between Project Risk Monitoring, Control Practices, and Project Success in Construction Projects (Unpublished Doctoral dissertation, Northcentral University).

Office of the Auditor General (2018). Audit report for financial year 2017-2018

Organization, I. L. (2020). Guidance Note 1. 1: Project Design and Theory of Change. 2(June), 1–7. PMI. (n.d.). A guide to the project management body of knowledge (PMBOK guide). Project Management Institute.

Podsakoff, P. M., & Podsakoff, N. P. (2019). Experimental designs in management and leadership research: Strengths, limitations, and recommendations for improving publishability. The Leadership Quarterly, 30(1), 11-33.

Schober, P., Boer, C., & Schwarte, L.A. (2018). Correlation coefficients: Appropriate use and interpretation. Anesthesia and Analgesia, (126)5, 1763-1768. doi:10.1213/ANE.0000000000002864.

Sohu, S., Jhatial, A. A., Ullah, K., Lakhiar, M. T., & Shahzaib, J. (2018). Determining the critical success factors for highway construction projects in Pakistan. Engineering, Technology and Applied Science Research, 8(2), 2685-2688. Re-trieved from https://www.etasr.com/index.php/ETASR/article/view/1866/pdf.

Tavakolan, M., & Mohammadi, A. (2018). Risk management workshop application: a case study of Ahwaz Urban Railway project. International Journal of Construction Management, 18:3, 260-274. doi:10.1080/15623599.2017.1325112

Tuyishime, A. C., & Nyambane, D. (2021). Planning and project performance in public institutions in Rwanda. A case of establishment of a Frequency Spectrum Management and monitoring system project in Rwanda. The Strategic Journal of Business & Change Management, 8 (1), 780 – 790.

Usanase Alice. (2021). Project communication management and performance of selected non-governmental organization projects in Kigali Rwanda: A case of profifa project. A Research Project Submitted in Partial Fulfilment for the Award of Degree in Master of Business Administration (Project Management Option) of Mount Kenya University

Uwanyirigira, V., & Rusibana, D. C. (2020). Determinants of Project Scope and Project Performance: Project. International Journal of Scientific and Research Publications (IJSRP), 10(11), 1098–1114. https://doi.org/10.29322/ijsrp.10.11.2020.p107104

Wainainah, D. (2019). Cyber Threats Multiply As Use Of Smart Gadgets Continues To Grow. Technology. Accessed August 0,802022https://www.businessdailyafrica.com/corporate/tech/4258474-5055282 89ehu1z/index.html

Downloads

Published

2023-05-30

How to Cite

Abanyagasani , O., & Njenga Gitahi, S. (2023). Project Planning Practices and Performance in Rwanda: A Case of Umurimo Kuri Bose Project in Rwamagana District. Journal of Entrepreneurship & Project Management, 7(3), 21–43. https://doi.org/10.53819/81018102t6060

Issue

Section

Articles