The Influence of Risk Management on Project Performance in Rwanda; A Case of Hinga Wunguke Project in Gatsibo District

Authors

  • Marie Grace Bora University of Kigali, Rwanda
  • Dr. Rusibana Claude University of Kigali, Rwanda

DOI:

https://doi.org/10.53819/81018102t2404

Abstract

The general objective of this study was to assess the influence of risk management on project performance in Rwanda. The study was guided by Specific Objectives such as to evaluate the effect of Risk Identification on Hinga Wunguke project performance in Gatsibo District, To determine the effect of Risk Assessment on Hinga Wunguke project performance in Gatsibo District, To establish the effect of Risk treatment on Hinga Wunguke project performance in Gatsibo District. This study will be conducted in Gatsibo District in the Eastern Province. The time of this research was limited in the period between 2020-2022.This time was enough to generate the desired information. This study adopted a inferential study design.  The study involved collection of data at a single point in time in the target population. The total population of this research was 140 employees and managers of Hinga Wunguke Project in Gatsibo district. The sources of data were primary and secondary data. To get primary data, the researcher went to the field and collected raw data from respondents, in this study, questionnaires, interviews and observations were used to collect primary data. Secondary data was collected by way of document reviews. The sample size was 140. To get primary data, the researcher went to the field and collected raw data from respondents, in this study, questionnaires, interviews and observations were used to collect primary data. SPPSS was used to run data after collection. The coefficient of determination R2 =0.744 indicates that approximately 74.4% of the variability in project performance can be explained by the predictors included in the model. Notably, the coefficient for Risk identification (B=0.590,p=0.023) demonstrates a statistically significant positive relationship with project performance. This suggests that for each unit increase in Risk identification, there is a corresponding increase of 0.590 in project performance, with the associated p-value indicating that this relationship is unlikely to have occurred by chance. However, the coefficients for Risk assessment (B=0.017,p=0.886) and Risk treatment (B=0.007,p=0.927) are not statistically significant, indicating that their impact on project performance may be negligible. These high p-values suggest that there is insufficient evidence to reject the null hypothesis, implying that the relationships between Risk assessment, Risk treatment, and project performance are not statistically significant. Consequently, despite having small coefficients, the lack of statistical significance implies that the observed effects of Risk assessment and Risk treatment on project performance may not be reliable or meaningful in the context of the study.

Key words: Risk Management, Risk Identification, Risk Assessment, Risk treatment, and Performance.

Author Biographies

Marie Grace Bora, University of Kigali, Rwanda

Master of Business Administration in Project Management, University of Kigali, Rwanda

Dr. Rusibana Claude, University of Kigali, Rwanda

Senior Lecturer, University of Kigali, Rwanda

References

Asian Development Bank (ADB) (2017). A review of techniques for risk management in projects. Benchmark International Journal, 14(1), 22-36.

Barare, J. (2014). The Effect of Risk Management Strategies on the Performance of Youth Projects in Nyamira County. Project Management Journal, 2(3), 32–44.

Ghani, R. A., & Mahmood, R. (2022). Risk Management Practices and Performance of Microfinancing Banks in Malaysia. Academia Journal UiTMT, 4(2), 26–33.

ImaN. C. & Borimnejad. M. (2017). Effects of Project RiskS Planning on Project Performance of Agaseke Project in Kigali, Rwanda. International Journal of Business and Management Review, 3(5), 29-51.

Irungu, G. W., & Makori, M. (2016). Determinants of performance of agricultural projects in Kenya: a case of Nyeri County. The Strategic Journal of Business and Change Management, 3(4), 462–480.

Kaliti, G. (2015). The Effect Of Risk Management Practices On Performance of Projects. Master of Arts Degree in Project Planning and Management Thesis. University of Nairobi.

Kausar, A., Nazir, M. S., & Butt, H. A. (2014). Capital Structure and Firm Value: Empirical Evidence from Pakistan. Asian Journal of Research in Economics and Finance, 1(1), 11–22.

Kenya Agricultural Research Institute (2015). The effectiveness of risk management: an analysis of project risk planning across industries and countries. Risk analysis, 31(1), 25-37.

Madembu&Namusonge (2017). Research Methodology-A Step-by-Step Guide for Beginners (2nd ed.). Singapore: Pearson Education.

Mamai, M., & Yinghua, S. (2017). Enterprise Risk Management Best Practices for Improvement Financial Performance in Manufacturing SMEs in Cameroon, 8(3), 1004–1012.

Muler, L., Lai, M., & Sorrenson, A. (2013). Influence Of Stakeholders Involvement On Project Performance: A Case Of Nema Automobile Emission Control Project In Nairobi County, Kenya. Journal of Business Administration, 2(3), 67–75.

Mungai, J. G. (2014). Operations Strategies and Project Performance of Japan International Cooperation Agency Funded Projects in Kenya. Journal of Business Administration, 2(3), 107–119.

Nyanje, S. O. (2016). Analysis of Factors Affecting the Implementation of Non-Governmental Organization Projects in Nakuru County, Kenya. International Journal of Economics, Commerce and Management, 5(5), 851–870.

Ogero, D. K. (2014). Influence Of Project Management Information System On Project Performance In The Construction Industry: A Case Of Nairobi County, Kenya. Master of Arts in Project Planning and Management Thesis. University of Nairobi.

Theuri, G. (2014). Determinants Of Project Sustainability Among Selected Non-Governmental Organizations In The Health Sector: A Case Of Nairobi County. International Journal of Business and Management, 2(1), 6–10.

Toledo, R., Engler, A., & Ahumada, V. (2011). Evaluation of Risk Factors in Agriculture: An Application of the Analytical Hierarchical Process (AHP) Methodology. Chilean Journal of Agricultural Research, 71(1), 114–121.

Downloads

Published

2024-05-16

How to Cite

Bora, M. G., & Rusibana, C. (2024). The Influence of Risk Management on Project Performance in Rwanda; A Case of Hinga Wunguke Project in Gatsibo District. Journal of Entrepreneurship & Project Management, 8(6), 1–10. https://doi.org/10.53819/81018102t2404