Project Design Practices and Sustainability of Telecommunication Project in Rwanda A Case of IHS Rwanda Ltd

Authors

  • Aimabe Pierre Bikorimana Mount Kenya University
  • Dr Eugenia Nkechi Irechukwu Mount Kenya University

DOI:

https://doi.org/10.53819/81018102t5164

Abstract

The paper investigated the contribution of project design practices on sustainability of telecommunication project with reference to IHS Rwanda Ltd. Specifically, it assessed the effect of scope, budget and risk design on sustainability of telecommunication project in IHS Rwanda Ltd.  The study was guided by change, planning, and system theories. The study used a descriptive with both qualitative and quantitative approaches. This paper drew a sample of 285 respondents from 913 beneficiaries. The sampled population was selected randomly and purposively to distribute questionnaire and hold interviews. For quantitative data analysis, descriptive and inferential statistics were used while qualitative data analysis used content analysis. There was an increase in defining course of activities affect Sustainability of telecommunication. Sequencing activities did not affect sustainability of telecommunication. Estimation time of activities affects sustainability of telecommunication by beneficiaries. Results showed that holding independent variables constant for estimating costs, budgeting costs, providing basis for budget and resource plan to a constant zero, social sustainability would be 0.568, a unit added in constant cost estimation stimulate the social sustainability in grade lead to limited by a factor of 0.23. Findings revealed that holding independent variables constant identifying risks, analyzing qualitative, quantitative and response risks, identification to a zero constant, the social sustainability at 0.25 a unit change in risk identification can reduce environment sustainability limited by a factor of 0.97. The study recommends that project managers should stimulate cooperation between changes in abilities, social development for attaining program success must focus on management skills to align with risk design. Project team members and beneficiaries should be aware of design projects in an effective manner that is capable to facilitate project performance. The project scope should be used to determine project cost with WBS being linked to project plan. This research recommended development of time schedules, precise and achievable plan, an accurate sequencing of actions. The project team should apply a simple method in order to assess pertinent risks easily. The study suggests similar research in other countries and regions to reflect the reality across region. Such results would provide a guideline that may help establishing government policies.

Keywords: Project Sustainability, Project Design Practices, Project Budget Design, Project Design Practices, Project Risk Design.

Author Biographies

Aimabe Pierre Bikorimana , Mount Kenya University

School of Business and Economics, Mount Kenya University, Kigali, Rwanda

Dr Eugenia Nkechi Irechukwu, Mount Kenya University

School of Business and Economics, Mount Kenya University, Kigali, Rwanda

References

1. Alawamleh, H. S., Bdah, A., & Alahmad, N. (2017). The Impact of Planning on the Quality of Educational Programs at Al-Balqa' Applied University. International Journal of Business Administration, 4(5), 38. https://doi.org/10.5430/ijba.v4n5p38

2. Ali, A. (2019). An assessment of the project planning practices of Addis Ababa housing project (Doctoral dissertation, St. Mary's University).

3. Amadi, J.O. (2017). The Role of Planning on Performance of Community Projects in Kenya. Developing Country Studies, 7(1), 1-7.

4. Anaam, E.A., Abu Bakar, K.A., Mohd Satar, N.S. and Ma’arif, M.Y. (2020). Investigating the electronic customer relationship management success key factors in the telecommunication companies: A pilot study. Journal of Computational and Theoretical Nanoscience, 17(2–3): 1460–1463. https://doi.org/10.1166/jctn.2020.8825

5. Anthony, O. U & Nick, N. I. (2018). Project Planning and Implementation in Nigeria: Revisiting international best practices. European Scientific Journal, 14(3), 1857 – 7881.

6. Ayegun. O. A., Falemu, J.O. A. & Olawumi,T.O. (2018). Assessment of Clients’ Perception and Satisfaction with Project. Journal of Sustainable Construction Engineering and Project Management.1 (1) 27-45

7. Banteyirya J. (2018). Effectiveness of Stakeholder’s engagement of CDF Projects in Kenya. A case of Ainamoi Constituency. International Journal of Arts and Commerce. 25(1), 38-57.

8. Bourne, L. & Walker, D.H.T. (2016). Using a Visualizing Tool to Study Stakeholder Influence two Australian Examples. Project Management Journal. 37(1), 5-21. https://doi.org/10.1177/875697280603700102

9. Carlgren, L. (2016). “Framing Design Thinking: The Concept in Idea and Enactment.” Creativity and Innovation Management. 25(1), 38-57. https://doi.org/10.1111/caim.12153

10. Chege, F. M., & Bowa, O. (2020). Project planning and project performance in Kenya: the case of non-governmental organisations implementing education projects in Nairobi County. International Academic Journal of Information Sciences and Project Management, 3(6), 312-337.

11. Day-Miller, E. A., & Easton, J. O. (2019). Designing education projects: A comprehensive approach to needs assessment, project planning and implementation, and evaluation. National Oceanic and Atmospheric Administration. Actatropic, 86(2): 275-282.

12. Finch, W.H. (2020). Using fit statistic differences to determine the optimal number of factors to retain in exploratory factor analysis. Educational and Psychological Measurement, 80(2): 217–241. https://doi.org/10.1177/0013164419865769

13. Freeman.E.L. (2017). Effectiveness of Stakeholder’s engagement of CDF Projects in Kenya. A case of Ainamoi Constituency. International Journal of Arts and Commerce. 1-76.

14. Gasabo District. (2020).Progress report on the implementation of Girinka Program in Simbi Sector. Huye District, Rwanda.

15. Henry G. (2017). Efficacy of Stakeholder’s engagement Function in Achieving Project Success in Kenya: A conceptual framework. Science journal of business and management, vol.3, No. 3, 2015, pp. 82-94. https://doi.org/10.11648/j.sjbm.20150303.14

16. Khanzada,B., Mubashir, T., Naeem, S.& Sohail, H.(2018), Impact of Project planning on Project success with Mediating Role of Risk Management and Moderating Role of Organization Culture. International Journal of Business and Social Science, 9(1),88-98

17. Mkutano, S. M., & Sang, P. (2018). Project management practices and performance of non- governmental organizations projects in Nairobi city county, Kenya. International Academic Journal of Information Sciences and Project Management, 3(3), 1-22.GSJ: Volume 9, Issue 11, and November 2021

18. Momin, M.M. & Nath. A. (2018). Project Scope Management: Apivotal tool for Project's success. International Journal of Management, IT and Engineering, 4(2), 279-288.

19. Motari, D. (2017). Factors influencing performance of solar energy project, a case study of Remba-Homabay Count (Master dissertation, The University of Nairobi, Kenya. Retrieved from erepository .uonbi.ac.ke

20. Murinzi,J., Mulyungi,P.& Muchelule,Y. (2018). Effect of project team skills on performance of IFAD funded projects in Rwanda: A case of Rural Sector Support Project. International Journal of Management and Commerce Innovation, 6(1), 1347-1354.

21. Mutoneshe J.F & Kwena (2021). Project Planning Practices and the Performance of Education Projects in Rwanda. A Case of SOS Children’s Villages. GSJ: Volume 9, Issue 11, November 2021, Online: ISSN 2320-9186

22. Nasser, A., Omar, A., & Gibril, N. (2017). Analysis of construction delay causes in dams projects in Oman. European Journal of Business and Social Sciences, 6(2), 19–42.105

23. Nzioka, C. (2018). Role of project planning on project success in Kenya: Acase study of Kenya Power infrastructure development project, International Journal of Novel Research in Engineering and Science, 4(1), 36-43

24. Obegi, O.D & Kimutai,G.J.(2017). Resource Scheduling and Project Performance of International Not-For-Profit Organizations in Nairobi City County, Kenya. International Academic Journal of Information Sciences and Project Management, 2(2), 199-217

25. Ocharo, R. N. (2018). Project management practices and implementation of power projects in Kenya. International Academic Journal of Information Sciences and Project Management, 3(1), 28-46

26. O'Donnell, K. A. (2019, May 9). How to make management planning more effective. Retrieved: http://www.yourarticlelibrary.com.

27. Ruuska, K. (2016). Project Communication. “IPMA 96” World Congress on Project Management: Paris, France Ic8

Downloads

Published

2023-05-23

How to Cite

Bikorimana , A. P. ., & Irechukwu, E. N. . (2023). Project Design Practices and Sustainability of Telecommunication Project in Rwanda A Case of IHS Rwanda Ltd. Journal of Entrepreneurship & Project Management, 7(2), 78–92. https://doi.org/10.53819/81018102t5164

Issue

Section

Articles

Most read articles by the same author(s)

1 2 3 > >>