Abstract

The general objective of this research was to assess the risk management process and project performance. The descriptive research design with a mixed qualitative and quantitative approach was used to a sample of 118 respondents selected from 168 target population using stratified sampling technique and Sloven’s formula. SPSS Statistical software was used in the analysis of the collected data into descriptive statistics by the help of mean and standard deviation. The inferential statistics were also analyzed as regression and correlation analysis. The results of this research have shown that project risk identification and performance of Mpazi channel construction project has a highly positive and significant relationship, with a coefficient of correlation of 0.970 and sig=.000, which is less than 0.05 level significance. The correlation results have also revealed r=0.979 and sig=0.00 which is less than 0.05 level of significance, hence proving a highly positive and significant relationship between project risk management strategy and performance of Mpazi channel construction project. The correlation results have also shown an r =0.985 and sig=0.00 which is less than 0.05 proving significant and positive relationship between project risk plan response and Mpazi Channel construction project performance. The research also found that a combination of project risk identification, risk management plan and risk plan response contributed to 97.5 percent (R2= 0.975) of the Mpazi Channel construction project success. Thus, the researcher concluded that the project risk management procedure has an impact on the performance of the Mpazi Channel construction project. Basing on the findings of the study, researcher recommends that a formal and planned project risk management procedure should be implemented throughout project planning to key construction personnel, support staff, and laborers.

Keywords: Project Risk Management Process, Project Performance, Construction, Rwanda

Author Biographies

Liliose Igihozo, Mount Kenya University, Rwanda

School of Business and Economics, Master of Business Administration (MBA), Project Management, Mount Kenya University, Kigali, Rwanda

Eugenia Nkechi Irechukwu, Mount Kenya University, Rwanda

Mount Kenya University, Kigali, Rwanda

References

Aimable, S. (2015). Effects of risk management methods on project performance in Rwandan construction industry: A case study of the multi-store constructions construction project of RSSB. Master's thesis, University of Agriculture and Technology (Kigali Campus), Rwanda.

ALSaadi, N., & Norhayatizakuan, N. (2021). The Impact of Risk Management Practices on the Performance of Construction Projects. Studies of Applied Economics, 39(4). https://doi.org/10.25115/eea.v39i4.4164

Bajaj, D., Oluwoye, J., & Lenard, D. (1997). An analysis of contractors' approaches to risk identification in New South Wales, Australia. Construction Management & Economics, 15(4), 363-369. https://doi.org/10.1080/014461997372917.

EDR Risk Management Plan (MRD070). (2011). Accessed on 8/8/2021: ttps://capmf.cdt.ca.gov/pdf/templates/samples/FTB_EDR_RiskManagementPlan.pdf

Gajewska, E., & Ropel, M. (2011). Risk Management Practices in a Construction Project–a case study. Swedia, Chalmers University of Technology, 51-62.

Gitau, L. M. (2015). The effects of risk management at project planning phase on performance of construction projects in Rwanda. Jomo Kenyatta University of Agriculture and Technology, 1-76.

Hayford, F., & Sarfraz, A. (2013). Tools and Techniques for Project Risk Management: Perspective of Micro to Small Scale Construction Firms in Ghana.

Makombo, H. M. (2012). The risk management framework for organizations dealing with construction project management in South Africa.

Mhetre, K., Konnur, B. A., & Landage, A. B. (2016). Risk management in construction industry. International Journal of Engineering Research, 5(1), 153-155.

Office of the Auditor General of State Finances. (2013). Report of the Auditor General of State Finances for the year ended 30th June 2013. Retrieved from www.oag.gov.rw

Osipova, E. (2008). Risk management in construction projects: a comparative study of the different procurement options in Sweden (Doctoral dissertation, Luleå tekniska universitet).

Petrovic, D. (2017). Risk management in construction projects: A knowledge management perspective from Swedish contractors.

Project Management Institute. (2000). A Guide to the Project Management Body of Knowledge (2000 Edition apply.). Upper Darby, PA: Project Management Institute. https://doi.org/10.1177/875697280103200310.

Reddy, A. S. (2015). Risk management in construction industry-a case study. International Journal of Innovative Research in Science, Engineering and Technology, 4(10).

Renault, B. Y., Agumba, J. N., & Ansary, N. (2016, August). A theoretical review of risk identification: perspective of construction industry. In 5th Applied Research Conference In Africa (ARCA 2016), At Cape Coast, Ghana (Vol. 773, p. 782).

Ropel, M., & Gajewska, E. (2011). Risk Management Practices in a Construction Project–a case study (Master's thesis).

Shunmugam, S., & Rwelamila, P. D. (2014, September). An evaluation of the status of risk management in South African construction projects. In Conference paper presented at the Project Management South Africa (PMSA) Conference.

Tummala, R. V. M., Leung, H. M., Mok, C. K., Burchett, J. F. and Leung, Y. H. 1997. 'Practices, barriers and benefits of using risk management approaches in selected Hong Kong industries, International Journal of Project Management, 15(5): 297-312. https://doi.org/10.1016/S0263-7863 (96)00082-8

Downloads

Published

2022-02-26

How to Cite

Igihozo, L., & Irechukwu, E. N. (2022). Project Risk Management Process and Performance of Mpazi Channel Construction Project in Nyabugogo, Kigali-Rwanda. Journal of Strategic Management, 6(2), 31–44. https://doi.org/10.53819/81018102t2047

Issue

Section

Articles

Most read articles by the same author(s)