The purpose of this study was to assess the effect of Project risk Management Strategies on the Performance of the Urban Economic Development Initiative Project. The study was guided by the following specific objectives: To assess the effect of project risk planning strategy on the performance of the Urban Economic Development Initiative Project, to evaluate the effect of risk assessment strategy on the performance of the Urban Economic Development Initiative Project, to assess the effect of risk responses on the performance of the Urban Economic Development Initiative Project. A descriptive design was used for this research project. The study’s target population was equal to sample size of 45 due to population less than 100. Both primary and secondary research approaches were utilized in order to compile the data. For the primary data collection, the researcher adopted questionnaires, and for the secondary data collection, the researcher applied a documentary review. The gathered data was evaluated using both descriptive statistics, such as the use of frequency and percentage as well as the mean and standard deviation, and inferential statistics, such as the use of multiple linear regression analysis. Tables were employed to exhibit the results of the investigation, and a pilot study was carried out to evaluate the validity and reliability of the instrument that was utilized in the data collection process.  The results showed that Pearson Coefficient Correlation indicated that .694 relationship between project risk assessment strategy on the performance of Urban Economic Development Initiative Project. The third specific objective revealed the effect of project risk responses on the performance of the Urban Economic Development Initiative Project, the results showed that 8.9% strongly agreed and 88.9% agreed that reducing project risks contributes to the performance of the Urban Economic Development Initiative Project. In addition, project risk response improves the performance of the Urban Economic Development Initiative Project at r=.861 which is a strong positive correlation. The study concluded that risk planning, risk assessment, and risk response contribute highly to the performance of the project. In recommendation, project key stakeholders should apply risk avoidance strategy to improve the performance of socioeconomic project

Keywords: Project Risk Management, Performance Measurement, Socio-Economic Projects, Urban Economic Development, Risk Management Strategies, Rwanda's Development Initiatives

Author Biographies

Karasira Sibo Ulysse , Mount Kenya University

Masters Student

Eugenia Nkechi Irechukwu (PhD), Mount Kenya University

Senior Lecturer

References

Creswell, D. (2017). Knowledge management and organizational performance in the service industry: The role of transformational leadership beyond the effects of transactional leadership. Journal of Business Research, 67(8), 1622-1629.

Drumll, T. (2001). Risks in energy performance contracting (EPC) projects. Energy and Buildings, 92, 116-127.

Gunawan,O., & Ahsan, O.C. (2019). Influence of Project Management Practices on the Implementation of Kenya Primary Education Development Project in Nakuru County. American Journal of Humanities and Social Sciences Research (AJHSSR), 3(4), 247-264.

Hallowell, Q., Molenaar, E., &Fortunato,D.,(2013). Network theory-based analysis of risk interactions in large engineering projects. International Journal of Project Management, 19 (1), 157- 169.

Jean, Y. H. (2015). 'Practices, barriers and benefits of using risk management approaches in selected Hong Kong industries, International Journal of Project Management, 15(5): 297-312.

Kabirifar, K., & Mojtahedi, M. (2019). The effect of Engineering, Procurement and Construction (EPC) Phases on Project Performance: A Case of Large-scale Residential Construction Project. Buildings, 9(1), 15.

Kwak, L. (2017). Influence of project management practices on performance of projects in Unilever Kenya Ltd. International Academic Journal of Information Sciences and Project Management, 3(6), 392-.418.

Lam,U; and Lee, S. (2015). Effects of risk management methods on project performance in Rwandan construction industry: A case study of the multi-store constructions construction project of RSSB. Master's thesis, University of Agriculture and Technology (Kigali Campus), Rwanda.

LaPrad, L. (2018). Triple Constraint Theory in Project Management: Journal of Business and Management Research, Volume. 5, pp. 108-111.

Liliose, I. & Irechukwu, E. N. (2022). Project Risk Management Process and Performance of Mpazi Channel Construction Project in Nyabugogo, Kigali-Rwanda. Journal of Strategic Management. Vol 6(2) pp. 31-44. https://doi.org/10.53819/81018102t2047

Macharia, A. B. (2016). Risk management in construction industry. International Journal of Engineering Research, 5(1), 153-155.

Mbada, E. (2016). Risk management in Socioeconomic projects: a comparative study of the different procurement options in Sweden (Doctoral dissertation, Luleå tekniska universitet).

Mohammed,O., & Borgonovi, M. (2015). Education Project Implementation. Journal of International Cooperation in Education; 7 (1), pp.15-25

Mugenda, O. & Mugenda, A. (2016). Research Methods: Quantitative and Qualitative Approaches.

Muriana,K., Vizzini,Y.(2017). Project scope management and successful rollout of rural roads construction projects by Kenya rural roads authority (KERRA) Nyeri County Region, Kenya. International Journal of Project Planning and Management ,5(2), 232-244.

Musyoka, M. (2012). Risk Management Practices in a Construction Project–a case study. Swedia, Chalmers University of Technology, 51-62.

Njau, D. N., & Ogolla, P. (2017). Factors influencing project scope performance: A case of Kenya national youth service projects in Kenya. The Strategic Journal of Business & Change Management, 4(4), 207–220.

Nocco,G., and Stulz,P., (2006). Impact of risk management on project performance: the importance of soft skills. International Journal of Production Research, 53(2), 321-340.

Okumu,H., Wanjira ,P., (2019). A critical Success Factors Model for Projects Rise in Planning and Implementation, Proceedings of the 7th European Conference on Information Systems Reports.

Omondi, K. (2017). Influence of Stakeholders' Involvement on Performance of Social Projects At Kenya National Highways Authority. European Journal of Business Management, 1 (11), 384-404.

Pachur,A., Petrović, D. Č., Mihić, M. M., Obradović, V. L., &Bushuyev, S. D. (2018). Project success analysis framework: A knowledge-based approach in project management. International Journal of Project Management, 33(4), 772-783.

Pimchangthong,J., and Boonjing, W. S. (2019) Measuring Project Risk Management Process For Construction Contractors With Statement Indicators Linked to Numerical Scores. Engineering, Construction and Architectural Management, 17 Iss: 4, pp.336 – 351.

Rouse, M. (2015). Organizational impact of system quality, information quality, and service quality. Journal of Strategic Information Systems, Vol.19, pp.207–228.

Rugenyi, F. (2015). Assessment of the Triple Constraints in Projects in Nairobi: The Project Managers' Perspective. International Journal of Academic Research in Business and Social

Tuyisenge, J. (2021). On the development of project management research: schools of thought and critique. International Project Management Journal;8(1):20–31.

Ubani,G., Mitchell, R. K., Agle, B. R. & Wood, D. J. (2020). Toward a Theory of Stakeholder Identification and Salience: Defining the Principle of Who and What Really Counts. Academy of Management Review. 22, No 4, pp 853 – 886.

Downloads

Published

2023-06-03

How to Cite

Ulysse , K. S., & Irechukwu, E. N. (2023). Project Risk Management Strategies and Performance of Socio-Economic Projects in Rwanda: A Case of Urban Economic Development Initiative Project. Journal of Entrepreneurship & Project Management, 7(3), 65–86. https://doi.org/10.53819/81018102t4147

Issue

Section

Articles

Most read articles by the same author(s)

1 2 3 > >>