Resources Management Practices and Project Performance in Rwanda: A Case of Skills Development Fund Project

Authors

  • Ms. Solange Uwase Mount Kenya University, Kigali, Rwanda
  • Dr. Eugenia Nkechi Irechukwu Mount Kenya University, Kigali, Rwanda

DOI:

https://doi.org/10.53819/81018102t2167

Abstract

This study examined the effect of resources management practices on project performance specifically in Skills Development Fund Project. The researcher used descriptive research design with qualitative and quantitative approaches. The target population was 1340 project beneficiaries, stakeholder and external parties and the sample size was 297 respondents calculated using Krejcie and Morgan Table. The researcher used simple random sampling techniques for selecting the sample size. Data collection tools were questionnaire and interview guide. The results of first objective indicate that project team acquisition has a significant positive effect on the performance of SDF projects in Rwanda. The respondents strongly agreed with this assertion, as reflected by the overall mean score of 4.235. The correlation analysis further supported these findings, revealing a strong relationship between project team acquisition and timely completion (r=0.933), completion with required quality (r=0.959), and completion within budgeted cost (r=0.973). The findings of second objective demonstrate a significant positive relationship between project team development and the performance of SDF projects in Rwanda. The respondents strongly agreed with this relationship, as evidenced by the overall mean score of 4.222. The correlational analysis further supported these results, revealing a strong and statistically significant relationship between project team development and timely completion (r=0.967), completion with required quality (r=0.993), and completion within budgeted cost (r=0.993). Lastly, the third objective indicate that project team management has a significant positive effect on the performance of SDF projects in Rwanda. The respondents strongly agreed with this assertion, as reflected by the overall mean score of 4.278. The correlational analysis further supported these findings, revealing a strong and statistically significant relationship between project team management and timely completion (r=0.954), completion with required quality (r=0.993), and completion within budgeted cost (r=0.993). These correlations indicate that effective project team management is associated with improved timely completion, quality, and cost control of SDF projects. Additionally, the regression results showed that project resource management accounted for 93.5% of the variability in timely completion, 99.4% of the variability in completion with required quality, and 99.4% of the variability in completion within budgeted cost. Thus, based on the descriptive, correlation, and regression results, we can conclude that project team, acquisition, development, and management have a positive and significant impact on the performance of SDF projects in Rwanda.

Keywords: Resources Management Practices, Project Performance, Skills Development Fund, Rwanda

Author Biographies

Ms. Solange Uwase, Mount Kenya University, Kigali, Rwanda

School of Business and Economics, Master of Business Administration (MBA), Project Management, Mount Kenya University, Kigali, Rwanda

Dr. Eugenia Nkechi Irechukwu, Mount Kenya University, Kigali, Rwanda

Mount Kenya University, Kigali, Rwanda

References

Assaf, Sadi & Hassanain, Mohammad & Mughal, Hafiz. (2014). Effectiveness of Project Teams and their Impact on the Performance of Saudi Construction Projects. Research Journal of Applied Sciences, Engineering and Technology. 7. 5148-5156. 10.19026/rjaset.7.911.

Atkson, W. (2014). CA’S Procurement Overhaul focuses on Global Expertise. New York: Ronald Press.

Bail, D. (2015). Supplier Selection. Michigan, US: Dar es Salaam: Stephen M. Ross School of Business.

Baily, P. (2017). Controlling and Supply management. 8th edition, London city: Pearson education limited.

Castro, M., Barcaui, A., Bahli, B. & Figueiredo, R. (2022). Do the Project Manager’s Soft Skills Matter? Impacts of the Project Manager’s Emotional Intelligence, Trustworthiness, and Job Satisfaction on Project Success. Administrative Sciences 12: 141. https://doi.org/ 10.3390/admsci12040141

Chidi, C., O., & Shadare, O., A.,. (2011). Managing human capital development in small and medium- sized enterprises for sustainable national development in Nigeria, International Journal of Management & Information Systems – Second Quarter 2011 Vol. 15, No. 2

Cooper, D., & Schindler, P., (2011) Business Research Methods, (11th ed). New Delhi: McGraw-Hill

Dasí, À., Pedersen, T., Barakat, L. L., & Alves, T. R. (2021). Teams and Project Performance: An Ability, Motivation, and Opportunity Approach. Project Management Journal, 52(1), 75–89. https://doi.org/10.1177/8756972820953958

Ekanem, I. (2010). Liquidity management in small firms: a learning perspective. Journal of Small Business and Enterprise Development, 17(1): 123-138

Hasan, H. & Mukhtar, A. (2019). The Impact of Project Management Methodologies on Project Success: A Case Study of the Oil and Gas Industry in the Kingdom of Bahrain. International Journal of Innovative Science and Research Technology, 4(1), 23-31.

Ika, L. A., 2014.Project success as a topic in project management journals. Project Management Journal, 40(4), pp. 6-19.

Kara, K. & Kester, Q.A. (2015). The Impact of Effective Project Team Management on Project Team Productivity: A Case Study of Ghana Broadcasting Corporation Education Project. International Journal of Social Sciences. 3 (2), 63-70.

Krejcie, R. V., & Morgan, D. W. (1970). Determining sample size for research activities. Educational and Psychological Measurement, 30(3), 607–610.

Manata, B., Miller, V. D., Mollaoglu, S., & Garcia, A. J. (2022). Documenting the Interactive Effects of Project Manager and Team-Level Communication Behaviors in Integrated Project Delivery Teams. Project Management

Miller, G. T., & Spoolman, S. (2011). Living in the environment: principles, connections, and solutions. Cengage Learning.

Morley, M. (2010). Spacey - A Python-based library of tools for the space sciences (No. LA-UR-10-04308; LA-UR-10-4308). Los Alamos National Lab.(LANL), Los Alamos, NM (United States).

Musirikare, A. & Kule, J. (2016). Project Delays on Cost Overrun Risks: A Study of Gasabo District Construction Projects Kigali, Rwanda. ABC Journal of Advanced Research. 5. 21-34. 10.18034/abcjar.v5i1.55.

Rugenyi, F. (2015). Assessment of the Triple Constraints in Projects in Nairobi: The Project Managers’ Perspective. International Journal of Academic Research in Business and Social Sciences, 5 (11), 1-16. DOI: 10.6007/IJARBSS/v5-i11/1889.

Tuyishime, P. (2020). Factors affecting time and cost performance of construction projects in Rwanda. A case study of high-rise building project in Kigali. master thesis at University of Nairobi, Nairobi, Kenya.

Downloads

Published

2023-07-01

How to Cite

Uwase, S., & Irechukwu, E. N. (2023). Resources Management Practices and Project Performance in Rwanda: A Case of Skills Development Fund Project. Journal of Entrepreneurship & Project Management, 7(7), 114–130. https://doi.org/10.53819/81018102t2167

Issue

Section

Articles

Most read articles by the same author(s)

1 2 3 > >>