Beneficiaries’ Participation and Performance of Non-Governmental Projects in Rwanda: A Case of Socio-Economic Development Empowerment Project in Optima Organization

Authors

  • Mukarurinda, Marie Therese Mount Kenya University
  • Eugenia Nkechi Irechukwu (PhD) Mount Kenya University

DOI:

https://doi.org/10.53819/81018102t4145

Abstract

This research was based on the effect of Beneficiaries   participation on the performance of non-governmental project in Rwanda, a case of socio-economic development empowerment project in Optima organization. The objectives of the study were: To determine the effect of beneficiaries engagement in planning on the performance of socio-economic development empowerment project in Optima organization, to assess the effect of involvement of beneficiaries in implementation on the performance of socio-economic development empowerment project in Optima organization, to establish the effect of beneficiaries engagement in monitoring on the performance of socio-economic development empowerment project in Optima organization. Researcher used a descriptive and case study research design. 154 was considered as the target population, and a sample size of 111 was used as respondents. The respondents were chosen using a stratified and simple random sampling method, is the way of giving everyone in each stratum an equal chance to take part in the study. Research used both primary and secondary data collection techniques. A questionnaire was utilized to gather primary data, and a documentary review was performed to collect secondary data. The researchers assigned the questionnaires with codes and proceed to enter them into the solutions product and Social Sciences for analysis. Data was then analyzed in the form of frequencies, percentages standard deviations and means, inferential statistical and presented in table. Beneficiaries participation influences performance of socio-economic development empowerment project in Optima organization at Regression analysis of r=73.8%. The study concluded that beneficiary’s participation contributes significantly to the performance of socio-economic development empowerment project in Optima organization. In recommendation, policy makers should make policies considering to the involvement of beneficiaries at all levels of projects development. Moreover, the research recommended project managers at national and local levels, to improve the level beneficiaries participate in project planning phase. Lastly, the research urged non-governmental organizations to ensure that beneficiaries participate actively in projects development at all levels.

Keywords: Beneficiary Engagement, Socio-economic Impact, Performance Evaluation, Monitoring Empowerment Metrics, Project performance.

Author Biographies

Mukarurinda, Marie Therese , Mount Kenya University

Master’s Student

Eugenia Nkechi Irechukwu (PhD), Mount Kenya University

Senior Lecturer

References

Christella, G.R., Irechukwu. E. N. (2021). Implementation Factors and Community Project Performance in Rwanda: A Case of Water Aid Rwanda Project (Warp) In Gahanga Sector.

Eligious, M., Irechukwu., E. N. (2022). Stakeholder Involvement and Model Villages Project Sustainability in Rwanda: A Case of Model Villages Project in Rweru Sector, Bugesera District. Journal of Entrepreneurship & Project Management, 6(5), 44 - 63. https://doi.org/10.53819/81018102t2097

Heravi, A. C. V. a. T. B., (2019).‘Evaluating the level of stakeholder involvement during the project planning processes of building projects’.International Journal of Project Management. , 33(5), p. 985–997. https://doi.org/10.1016/j.ijproman.2014.12.007

Keshkamat, S. S., Looijen, J. M., &Zuidgeest, M. H. (2019). The formulation and evaluation of transport route planning alternatives: a spatial decision support system for the Via Baltica project, Poland. Journal of transport geography, 17(1), 54-64. https://doi.org/10.1016/j.jtrangeo.2008.04.010

Layern, R. (2020), ―Evaluation in the project management environment; Project Management Journal, Vol. 16.

Locatelli, G., Invernizzi, D. C., & Brookes, N. J. (2017). Project characteristics and performance in Europe: An empirical analysis for large transport infrastructure projects. Transportation research part A: policy and practice, 98, 108-122. https://doi.org/10.1016/j.tra.2017.01.024

Mieszkowski, K., &Kardas, M. (2015).Facilitating an entrepreneurial discovery process for smart specialisation.The case of Poland. Journal of the Knowledge economy, 6(2), 357- 384. https://doi.org/10.1007/s13132-015-0242-y

Ulibarri, N., Scott, T. A., & Perez-Figueroa, O. (2019).How does stakeholder involvement affect environmental impact assessment?.Environmental Impact Assessment Review, 79, 106309. https://doi.org/10.1016/j.eiar.2019.106309

World Bank (2017) Comparative Analysis of Public Finance Management Reforms. World Bank, Washington DC

Yang, R. J. (2021). Effect of stakeholder collaborative management on off-site construction cost performance. Journal of Cleaner Production, 184, 490-502. https://doi.org/10.1016/j.jclepro.2018.02.258

Downloads

Published

2023-05-31

How to Cite

Mukarurinda, M. T. ., & Irechukwu, E. N. . (2023). Beneficiaries’ Participation and Performance of Non-Governmental Projects in Rwanda: A Case of Socio-Economic Development Empowerment Project in Optima Organization. Journal of Entrepreneurship & Project Management, 7(3), 44–64. https://doi.org/10.53819/81018102t4145

Issue

Section

Articles

Most read articles by the same author(s)

1 2 3 > >>